Construction Update for Sept. 25, 2015

Activities This Week

  • Continue Site Excavation To Drilled Pier Grade in Performing Arts Center
  • Continue H-Pile Drilling/Installation for Shoring Wall System at Southwest Private Deck
  • Continue Temporary Construction De-watering System Installation
  • Began Deep Foundation Installation at Performing Arts Center Elevation 1100’
  • Continue Excavation at East City Parking Deck
  • Continue Georgia Power Trenching at Sandy Springs Circle

Activities Next Week

  • Continue Site Excavation To Drilled Pier Grade in Performing Arts Center
  • Continue H-Pile Drilling/Installation for Shoring Wall System at Southwest Private Deck
  • Continue Temporary Construction De-watering System Installation
  • Continue Deep Foundation Installation at PAC
  • Continue Excavation at East City Parking Deck
  • Continue Georgia Power Trenching at Sandy Springs Circle
  • Begin Preparing H-Piles for Shotcrete at shoring walls