Construction Activities for the Week of May 18, 2017

Construction Activities This Week

Site/Park

  • Continued Construction of the Restroom Building.
  • Continued Installation of Plaza & Interactive Fountain.
  • Continued Waterproofing of the PAC Fountain.
  • Continued Forming of Planters, Site Walls & Stair at the Shade Bosque.
  • Continued Sub-slab Installation at City Green.

Performing Arts Center

  • Continued hanging Hard Ceilings.
  • Continued PAC Scaffolding at Orchestra Level.
  • Continued Overhead MEP Rough-in at PAC Lower Mechanical Room, Trap & Lobby Level.
  • Continued Fire Protection Installation at Gallery Level and Lobby Bar.
  • Continued Plaster Installation.
  • Continued CE-01 Elevator Installation.
  • Continued MEP Overhead Installation at Lobby Level.
  • Continued Brick Installation at North Elevation.

Office Tower & Studio Theatre

  • Continued Conference Level Parapet Waterproofing.
  • Continued Metal Panel Installation.
  • Continued Stair Installation.
  • Continued Chiller Plant Piping Insulation Installation.
  • Continued Tile Prep at Kitchen.
  • Continued Installation of Glass/Glazing.
  • Continued Roofing Installation at Office Tower.
  • Continued Acoustical Spray Insulation at Studio Theater.
  • Continued Framing of Hard Lid Ceilings at Service, Lobby, Gallery Levels.

CIP Deck

  • Continued East Deck Sprinkler Pipe Installation.
  • Continued East Deck Sprinkler Room Buildout.
  • Continued Point, Patch, and Rub of Columns and Sheer-walls at East Deck.

Roadways/Public Utility

  • Continued SSC West Storm Drainage work.
  • Continued GA Power Jack & Bore at Roswell Rd.
  • Commenced Roswell Rd Curb Improvements.

Construction Activities Next Week

Site/Park

  • Continue Restroom Building CMU Installation.
  • Continue Installation of Plaza & Interactive Fountain.
  • Continue Waterproofing of the PAC Fountain.
  • Continue Forming of Planters, Site Walls & Stair at the Shade Bosque.
  • Continue Sub-slab Installation at City Green.

Performing Arts Center

  • Continue hanging Hard Ceilings.
  • Continue PAC Scaffolding at Orchestra Level.
  • Continue Overhead MEP Rough-in at PAC Lower Mechanical Room, Trap & Lobby Level.
  • Continue Fire Protection Installation at Gallery Level and Lobby Bar.
  • Continue Plaster Installation.
  • Continue CE-01 Elevator Installation.
  • Continue MEP Overhead Installation at Lobby Level.
  • Continue Brick Installation at North Elevation.
  • Commence Installation of Walk-In Cooler.

Office Tower & Studio Theatre

  • Continue Metal Panel Installation.
  • Continue Stair Installation.
  • Continue Chiller Plant Piping Insulation Installation.
  • Continued Conference Level Parapet Waterproofing.
  • Continue Installation of Glass/Glazing.
  • Continue Roofing Installation at Office Tower.
  • Continue Acoustical Spray Insulation at Studio Theater.
  • Continue Framing of Hard Lid Ceilings at Service, Lobby, and Gallery Levels.
  • Commence Installation of Tile at Kitchen.

CIP Deck

  • Continue East Deck Sprinkler Pipe Installation.
  • Continue East Deck Sprinkler Room Buildout.
  • Continue Point, Patch, and Rub of Columns and Sheerwalls at East Deck.

Roadways/Utilities

  • Continue Sandy Springs West Stormwork.
  • Continue GA Power Jack & Bore at Roswell Rd.
  • Continue Roswell Rd Curb Improvements.