Construction Activities for the week of February 5, 2016

Construction Activities Impacting Traffic Flow:

 A lane closure is underway on the northern-most lane on Johnson Ferry Road, beginning at Ferry Drive and ending just before Sandy Springs Circle. The lane will be closed Monday through Friday between the hours of 9 a.m. and 4 p.m.  Flagmen will direct the traffic flow at that closure, with the closure expected to be in effect through the month, weather permitting.

Message boards will be in place, and motorists are urged to plan for a slower pace and use added caution when driving in that area.

The traveling public is encouraged to check the City’s Road Work Advisory page found on the City’s website (shortcut: http://spr.gs/roadwork) and also available through the Sandy Springs Works mobile app (free in the app store).

This Week’s Construction Activities

Site/Structure

  • Continued Site Excavation To Drilled Pier Grade in Performing Arts Center, At Southwest Private Deck in Support of Shotcrete Wall Installation, and East Deck

Performing Arts Center

  • Completed Deep Foundation Installation at PAC: Phase 5, Gridline Y6-W3 & WD-TE.5
  • Completed 1st Lift Wall Pour: Phase 3 & 4, Gridlines WD-TE.5 and TO-Z2
  • Completed Elevator Wall Pour: O5-W3 & PAA-WA
  • Commenced Spread Footing Excavation: Gridlines TC.2-TD.5 & X1-Y3
  • Continued Slab on Grade Prep: Gridlines W1-W3 & WA – WD

Building

  • Continued Deep Foundation Installation at Office Building: Grid Line OB-RA at O1-O4.
  • Continued O8 Line Excavation.

Parking Deck

  • Continued Footings at Southwest Private Deck: Grid-line PA.1-PE.7 & P7-P11
  • Continued Controlled Rock Blasting in CIP Parking Deck: Grid Line PG-PN & P5-P7
  • Continue Shotcrete and Tiebacks at East and West Deck: Grid Line PH-PS & P1-P6 and TE-PJJ and O8-P6

Other

  • Continued Georgia Power Trenching at Mount Vernon HWY NE
  • Commenced Existing Wall Demo at Mount Vernon HWY NE
  • Commenced Dirt Stockpile in at NW Corner of Site

 

Next Week’s Construction Activities

Site/Structure

  • Continue Site Excavation To Drilled Pier Grade in Performing Arts Center, At Southwest Private Deck in Support of Shotcrete Wall Installation, and East Deck.Performing Arts Center
  • Complete Slab on Grade Prep and Placement: Phase 4, Gridlines W1-W3 & WA-WD.
  • Commence 2nd Lift Wall Forms and Placement: Phase 4, W1-W3 & WA-WD.
  • Continue Spread Footing and Grade Beam Excavation, Resteel, and Placement: Gridlines WD-TE.5 & X1-Y7.

Building

  • Continue Deep Foundation Installation at Office Build-ing: Grid Line OB-RA at O1-O4.
  • Continue Excavation of O8 Line.

Parking Deck

  • Continue Footings at Southwest Private Deck: Gridline PA.1-PE.7 & P7-P11
  • Commence Additional Deep Foundation Drilled Piers: Gridline PA.1 at P8-P5.
  • Continue Controlled Rock Blasting in CIP Parking Deck: Grid Line PG-PN & P5-P7
  • Continue Shotcrete and Tiebacks at East and West Deck: Grid Line PH-PS & P1-P6 and TE-PJJ and O8-P6

Other

  • Continue Georgia Power Trenching at Mount Vernon HWY NE
  • Continue Existing Wall Demo at Mount Vernon HWY NE
  • Continue Dirt Stockpile in at NW Corner of Site